Gas transmission pipeline · Ouargla to El-Oued

Southern Algeria Gas Transmission Network

Southern Algeria Gas Transmission Network is an under construction gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 242 km long. It runs from Ouargla to El-Oued. It is owned by Société Algérienne de Gestion du Réseau de Transport du Gaz (GRTG).

Length

242 km

Capacity

Not reported

Segments tracked

1

Largest diameter 711 mm (28 in)

Route

Southern Algeria Gas Transmission Network runs from Ouargla to El-Oued. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ouargla
To
El-Oued
Start country
Algeria
End country
Algeria
Countries crossed
Algeria
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
271 km
GEM pipeline ID
P2060
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Hassi Messaoud-El Oued Gas PipelineUnder constructionOuargla → El-Oued242Not reported711 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Southern Finland LNG TerminalFinlandImportCancelledname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.