LNG Chain

Gas transmission pipeline · Serpukhov to St. Petersburg

Serpukhov-Kalinin-Leningrad Pipeline

Serpukhov-Kalinin-Leningrad Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 803 km long and 3.7 bcm/y of capacity, starting up in 1959. It runs from Serpukhov to St. Petersburg. It is owned by Gazprom PJSC.

Length

803 km

Capacity

3.7 bcm/y

2.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 720 mm (28 in)

Route

Serpukhov-Kalinin-Leningrad Pipeline runs from Serpukhov to St. Petersburg. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Serpukhov
To
St. Petersburg
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
783 km
GEM pipeline ID
P1456
Start year
1959
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingSerpukhov → St. Petersburg8033.7720 mm1959GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Serpukhov-Kalinin-Leningrad Pipeline run?
Serpukhov-Kalinin-Leningrad Pipeline runs from Serpukhov to St. Petersburg, crossing Russia.
How long is Serpukhov-Kalinin-Leningrad Pipeline?
Serpukhov-Kalinin-Leningrad Pipeline is 803 km long.
How much gas can Serpukhov-Kalinin-Leningrad Pipeline carry?
Serpukhov-Kalinin-Leningrad Pipeline has a design capacity of 3.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Serpukhov-Kalinin-Leningrad Pipeline operating?
Serpukhov-Kalinin-Leningrad Pipeline is operating, having started in 1959.
Who owns Serpukhov-Kalinin-Leningrad Pipeline?
Serpukhov-Kalinin-Leningrad Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.