Gas transmission pipeline · Astana to Kokshetau
Saryarka Gas Pipeline
Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 276 km long, starting up in 2028. It runs from Astana to Kokshetau. It is owned by AstanaGaz KMG JSC.
Length
276 km
Capacity
Not reported
Segments tracked
1
Largest diameter 630 mm (25 in)
Route
Saryarka Gas Pipeline runs from Astana to Kokshetau. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Astana
- To
- Kokshetau
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 333 km
- GEM pipeline ID
- P3307
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase II (Astana-Kokshetau Gas Pipeline) | Proposed | Astana → Kokshetau | 276 | Not reported | 630 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.