Gas transmission pipeline · Komsomolsk-on Amur to Khabarovsk
Sakhalin-Khabarovsk-Vladivostok Gas Pipeline
Sakhalin-Khabarovsk-Vladivostok Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 391 km long and 15 bcm/y of capacity, starting up in 2021. It runs from Komsomolsk-on Amur to Khabarovsk. It is owned by Gazprom PJSC.
Length
391 km
Capacity
15 bcm/y
11.0 Mtpa LNG equivalent
Segments tracked
1
Route
Sakhalin-Khabarovsk-Vladivostok Gas Pipeline runs from Komsomolsk-on Amur to Khabarovsk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Komsomolsk-on Amur
- To
- Khabarovsk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 345 km
- GEM pipeline ID
- P2027
- Start year
- 2021
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Komsomolsk-on-Amur-Khabarovsk II Gas Pipeline | Operating | Komsomolsk-on Amur → Khabarovsk | 391 | 15 | — | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sakhalin II LNG Terminal | Russia | Export | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sakhalin-Khabarovsk-Vladivostok Gas Pipeline run?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline runs from Komsomolsk-on Amur to Khabarovsk, crossing Russia.
- How long is Sakhalin-Khabarovsk-Vladivostok Gas Pipeline?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline is 391 km long.
- How much gas can Sakhalin-Khabarovsk-Vladivostok Gas Pipeline carry?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline has a design capacity of 15 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Sakhalin-Khabarovsk-Vladivostok Gas Pipeline operating?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline is operating, having started in 2021.
- Who owns Sakhalin-Khabarovsk-Vladivostok Gas Pipeline?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
- Does Sakhalin-Khabarovsk-Vladivostok Gas Pipeline serve an LNG terminal?
- Sakhalin-Khabarovsk-Vladivostok Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.