Gas transmission pipeline · Saint Stefano Di Magra to Cortemaggiore
Saint Stefano Di Magra-Cortemaggiore Gas Pipline
Saint Stefano Di Magra-Cortemaggiore Gas Pipline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 122 km long, starting up in 1967. It runs from Saint Stefano Di Magra to Cortemaggiore. It is owned by Snam Rete Gas SpA.
Length
122 km
Capacity
Not reported
Segments tracked
1
Largest diameter 750 mm (30 in)
Route
Saint Stefano Di Magra-Cortemaggiore Gas Pipline runs from Saint Stefano Di Magra to Cortemaggiore. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Saint Stefano Di Magra
- To
- Cortemaggiore
- Start country
- Italy
- End country
- Italy
- Countries crossed
- Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 110 km
- GEM pipeline ID
- P4292
- Start year
- 1967
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Saint Stefano Di Magra → Cortemaggiore | 122 | Not reported | 750 mm | 1967 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Panigaglia LNG Terminal | Italy | Import | Operating | 10.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Snam SpA100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Saint Stefano Di Magra-Cortemaggiore Gas Pipline run?
- Saint Stefano Di Magra-Cortemaggiore Gas Pipline runs from Saint Stefano Di Magra to Cortemaggiore, crossing Italy.
- How long is Saint Stefano Di Magra-Cortemaggiore Gas Pipline?
- Saint Stefano Di Magra-Cortemaggiore Gas Pipline is 122 km long.
- How much gas can Saint Stefano Di Magra-Cortemaggiore Gas Pipline carry?
- No design capacity is reported for Saint Stefano Di Magra-Cortemaggiore Gas Pipline. That is an absent figure, not a zero.
- Is Saint Stefano Di Magra-Cortemaggiore Gas Pipline operating?
- Saint Stefano Di Magra-Cortemaggiore Gas Pipline is operating, having started in 1967.
- Who owns Saint Stefano Di Magra-Cortemaggiore Gas Pipline?
- Saint Stefano Di Magra-Cortemaggiore Gas Pipline is owned by Snam Rete Gas SpA, as recorded in the current tracker release.
- Does Saint Stefano Di Magra-Cortemaggiore Gas Pipline serve an LNG terminal?
- Saint Stefano Di Magra-Cortemaggiore Gas Pipline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.