LNG Chain

Gas transmission pipeline · Rognano to Mortara

Rognano-Mortara Gas Pipeline

Rognano-Mortara Gas Pipeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 26 km long, starting up in 1995. It runs from Rognano to Mortara. It is owned by Snam Rete Gas SpA.

Length

26 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1200 mm (47 in)

Route

Rognano-Mortara Gas Pipeline runs from Rognano to Mortara. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Rognano
To
Mortara
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
32 km
GEM pipeline ID
P4295
Start year
1995
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingRognano → Mortara26Not reported1200 mm1995GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies