Gas transmission pipeline · Ballena to Jobo
Promigas Pipeline Network
Promigas Pipeline Network is an operating gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 2,537 km long and 9.73 bcm/y of capacity, starting up in 1977. It runs from Ballena to Jobo. It is owned by Promigas.
Length
2,537 km
Capacity
9.73 bcm/y
7.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1120546 mm (44116 in)
Route
Promigas Pipeline Network runs from Ballena to Jobo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ballena
- To
- Jobo
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 1,519 km
- GEM pipeline ID
- P2186
- Start year
- 1977
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Operating | Ballena → Jobo | 2,537 | 9.73 | 1120546 mm | 1977 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Amazónica LNG Terminal | Colombia | Import | Proposed | 0.9 km | route proximity |
| Coveñas FSRU | Colombia | Import | Proposed | 0.9 km | route proximity |
| El Viajano Altenesol LNG Terminal | Colombia | Import | Cancelled | 1 km | route proximity |
| Puerto Bahía LNG Terminal | Colombia | Import | Proposed | 1.2 km | route proximity |
| Cartagena FSRU (Colombia) | Colombia | Import | Operating | 1.3 km | route proximity |
| Caribe LNG Terminal | Colombia | Import | Under construction | 2 km | route proximity |
| Puerto Brisa LNG Terminal | Colombia | Import | Proposed | 3.3 km | route proximity |
| Colombia FLNG Terminal | Colombia | Export | Cancelled | 3.9 km | route proximity |
| Ciénaga FSRU | Colombia | Import | Proposed | 10.7 km | route proximity |
| Ballena FSRU | Colombia | Import | Proposed | 18 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Promigas100%
Parent companies
- Promigas SA ESP100%