LNG Chain

Gas transmission pipeline · Western Australia to Geraldton

Project Haber Gas Pipeline

Project Haber Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 120 km long and 0.87 bcm/y of capacity, starting up in 2024. It runs from Western Australia to Geraldton. It is owned by Strike Energy Ltd.

Length

120 km

Capacity

0.87 bcm/y

0.6 Mtpa LNG equivalent

Segments tracked

1

Route

Project Haber Gas Pipeline runs from Western Australia to Geraldton. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Western Australia
To
Geraldton
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
92 km
GEM pipeline ID
P5876
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledWestern Australia → Geraldton1200.872024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies