Gas transmission pipeline · Payra Port to Gopalgonj

Payra-Barishal-Gopalganj Gas Transmission Pipeline

Payra-Barishal-Gopalganj Gas Transmission Pipeline is a cancelled gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 153 km long, starting up in 2025. It runs from Payra Port to Gopalgonj.

Length

153 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Payra-Barishal-Gopalganj Gas Transmission Pipeline runs from Payra Port to Gopalgonj. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Payra Port
To
Gopalgonj
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
150 km
GEM pipeline ID
P6847
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledPayra Port → Gopalgonj153Not reported1067 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Payra LNG TerminalBangladeshImportCancelled1.1 kmroute proximity
Payra FSRUBangladeshImportCancelled1.5 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.