LNG Chain

Gas transmission pipeline · Deming to El Encino

Paso Norte Pipeline

Paso Norte Pipeline is a cancelled gas transmission pipeline crossing United States, Mexico. The tracker lists 1 tracked segment, 547 km long and 3.74 bcm/y of capacity. It runs from Deming to El Encino. It is owned by Paso Norte Pipeline Group.

Length

547 km

Capacity

3.74 bcm/y

2.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 813 mm (32 in)

Route

Paso Norte Pipeline runs from Deming to El Encino. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Deming
To
El Encino
Start country
United States
End country
Mexico
Countries crossed
United States, Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
528 km
GEM pipeline ID
P0382
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledDeming → El Encino5473.74813 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.