Gas transmission pipeline · Radovish to Petric
North Macedonia–Bulgaria Gas Pipeline
North Macedonia–Bulgaria Gas Pipeline is a proposed gas transmission pipeline crossing North Macedonia, Bulgaria. The tracker lists 1 tracked segment, 110 km long and 2.02 bcm/y of capacity. It runs from Radovish to Petric. It is owned by Bulgartransgaz and MER JSC Skopje.
Length
110 km
Capacity
2.02 bcm/y
1.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 500 mm (20 in)
Route
North Macedonia–Bulgaria Gas Pipeline runs from Radovish to Petric. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Radovish
- To
- Petric
- Start country
- North Macedonia
- End country
- Bulgaria
- Countries crossed
- North Macedonia, Bulgaria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 54 km
- GEM pipeline ID
- P3335
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Radovish → Petric | 110 | 2.02 | 500 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does North Macedonia–Bulgaria Gas Pipeline run?
- North Macedonia–Bulgaria Gas Pipeline runs from Radovish to Petric, crossing North Macedonia and Bulgaria.
- How long is North Macedonia–Bulgaria Gas Pipeline?
- North Macedonia–Bulgaria Gas Pipeline is 110 km long.
- How much gas can North Macedonia–Bulgaria Gas Pipeline carry?
- North Macedonia–Bulgaria Gas Pipeline has a design capacity of 2.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is North Macedonia–Bulgaria Gas Pipeline operating?
- North Macedonia–Bulgaria Gas Pipeline is proposed.
- Who owns North Macedonia–Bulgaria Gas Pipeline?
- North Macedonia–Bulgaria Gas Pipeline is owned by Bulgartransgaz and MER JSC Skopje, as recorded in the current tracker release.