Gas transmission pipeline · Egypt
Nooros–Abu Madi–El Gamil Gas Pipline
Nooros–Abu Madi–El Gamil Gas Pipline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 92 km long and 7.15 bcm/y of capacity, starting up in 2019.
Length
92 km
Capacity
7.15 bcm/y
5.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 813 mm (32 in)
Route
Nooros–Abu Madi–El Gamil Gas Pipline runs from Egypt. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Egypt
- End country
- Egypt
- Countries crossed
- Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 81 km
- GEM pipeline ID
- P8049
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Abu Madi–El Gamil Pipline | Operating | Not reported | 92 | 7.15 | 813 mm | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Damietta SEGAS LNG Terminal | Egypt | Export | Operating | 12.4 km | route proximity |
| Damietta FSRU | Egypt | Import | Operating | 13.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Nooros–Abu Madi–El Gamil Gas Pipline run?
- Nooros–Abu Madi–El Gamil Gas Pipline is recorded in Egypt. Global Energy Monitor reports no start and end points for it.
- How long is Nooros–Abu Madi–El Gamil Gas Pipline?
- Nooros–Abu Madi–El Gamil Gas Pipline is 92 km long.
- How much gas can Nooros–Abu Madi–El Gamil Gas Pipline carry?
- Nooros–Abu Madi–El Gamil Gas Pipline has a design capacity of 7.15 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Nooros–Abu Madi–El Gamil Gas Pipline operating?
- Nooros–Abu Madi–El Gamil Gas Pipline is operating, having started in 2019.
- Who owns Nooros–Abu Madi–El Gamil Gas Pipline?
- Ownership of Nooros–Abu Madi–El Gamil Gas Pipline is not reported in the current tracker release.
- Does Nooros–Abu Madi–El Gamil Gas Pipline serve an LNG terminal?
- Nooros–Abu Madi–El Gamil Gas Pipline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.