Gas transmission pipeline · Dutch continental shelf to Den Helder
Noordgastransport Gas Pipeline (NOGAT)
Noordgastransport Gas Pipeline (NOGAT) is an operating gas transmission pipeline crossing Denmark, Netherlands. The tracker lists 1 tracked segment, 470 km long and 5.5 bcm/y of capacity, starting up in 1975. It runs from Dutch continental shelf to Den Helder. It is owned by Noordgastransport B.V.
Length
470 km
Capacity
5.5 bcm/y
4.0 Mtpa LNG equivalent
Segments tracked
1
Route
Noordgastransport Gas Pipeline (NOGAT) runs from Dutch continental shelf to Den Helder. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Dutch continental shelf
- To
- Den Helder
- Start country
- Denmark
- End country
- Netherlands
- Countries crossed
- Denmark, Netherlands
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 529 km
- GEM pipeline ID
- P0711
- Start year
- 1975
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Dutch continental shelf → Den Helder | 470 | 5.5 | — | 1975 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Noordgastransport Gas Pipeline (NOGAT) run?
- Noordgastransport Gas Pipeline (NOGAT) runs from Dutch continental shelf to Den Helder, crossing Denmark and Netherlands.
- How long is Noordgastransport Gas Pipeline (NOGAT)?
- Noordgastransport Gas Pipeline (NOGAT) is 470 km long.
- How much gas can Noordgastransport Gas Pipeline (NOGAT) carry?
- Noordgastransport Gas Pipeline (NOGAT) has a design capacity of 5.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Noordgastransport Gas Pipeline (NOGAT) operating?
- Noordgastransport Gas Pipeline (NOGAT) is operating, having started in 1975.
- Who owns Noordgastransport Gas Pipeline (NOGAT)?
- Noordgastransport Gas Pipeline (NOGAT) is owned by Noordgastransport B.V, as recorded in the current tracker release.