Gas transmission pipeline · Louisiana to Gillis
New Generation Gas Gathering (NG3) Project
New Generation Gas Gathering (NG3) Project is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 443 km long and 17.37 bcm/y of capacity, starting up in 2025. It runs from Louisiana to Gillis.
Length
443 km
Capacity
17.4 bcm/y
12.8 Mtpa LNG equivalent
Segments tracked
1
Route
New Generation Gas Gathering (NG3) Project runs from Louisiana to Gillis. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Louisiana
- To
- Gillis
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 391 km
- GEM pipeline ID
- P5417
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Louisiana → Gillis | 443 | 17.4 | — | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does New Generation Gas Gathering (NG3) Project run?
- New Generation Gas Gathering (NG3) Project runs from Louisiana to Gillis, crossing United States.
- How long is New Generation Gas Gathering (NG3) Project?
- New Generation Gas Gathering (NG3) Project is 443 km long.
- How much gas can New Generation Gas Gathering (NG3) Project carry?
- New Generation Gas Gathering (NG3) Project has a design capacity of 17.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is New Generation Gas Gathering (NG3) Project operating?
- New Generation Gas Gathering (NG3) Project is operating, having started in 2025.
- Who owns New Generation Gas Gathering (NG3) Project?
- Ownership of New Generation Gas Gathering (NG3) Project is not reported in the current tracker release.
- Does New Generation Gas Gathering (NG3) Project serve an LNG terminal?
- New Generation Gas Gathering (NG3) Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.