LNG Chain

Gas transmission pipeline · Jakarta to West Java

Muara Karang-Muara Tawar Gas Pipeline

Muara Karang-Muara Tawar Gas Pipeline is an operating gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 30 km long and 2.76 bcm/y of capacity, starting up in 2016. It runs from Jakarta to West Java. It is owned by Perusahaan Gas Negara.

Length

30 km

Capacity

2.76 bcm/y

2.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Muara Karang-Muara Tawar Gas Pipeline runs from Jakarta to West Java. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jakarta
To
West Java
Start country
Indonesia
End country
Indonesia
Countries crossed
Indonesia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
60 km
GEM pipeline ID
P0974
Start year
2016
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingJakarta → West Java302.76610 mm2016GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Nusantara Regas Satu TerminalIndonesiaImportOperating11.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Muara Karang-Muara Tawar Gas Pipeline run?
Muara Karang-Muara Tawar Gas Pipeline runs from Jakarta to West Java, crossing Indonesia.
How long is Muara Karang-Muara Tawar Gas Pipeline?
Muara Karang-Muara Tawar Gas Pipeline is 30 km long.
How much gas can Muara Karang-Muara Tawar Gas Pipeline carry?
Muara Karang-Muara Tawar Gas Pipeline has a design capacity of 2.76 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Muara Karang-Muara Tawar Gas Pipeline operating?
Muara Karang-Muara Tawar Gas Pipeline is operating, having started in 2016.
Who owns Muara Karang-Muara Tawar Gas Pipeline?
Muara Karang-Muara Tawar Gas Pipeline is owned by Perusahaan Gas Negara, as recorded in the current tracker release.
Does Muara Karang-Muara Tawar Gas Pipeline serve an LNG terminal?
Muara Karang-Muara Tawar Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.