LNG Chain

Gas transmission pipeline · Reublic of Adygea to Nevinomyssk

Maykop-Nevinnomyssk Gas Pipeline

Maykop-Nevinnomyssk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 155 km long and 2.5 bcm/y of capacity, starting up in 1964. It runs from Reublic of Adygea to Nevinomyssk. It is owned by Gazprom PJSC.

Length

155 km

Capacity

2.5 bcm/y

1.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 720 mm (28 in)

Route

Maykop-Nevinnomyssk Gas Pipeline runs from Reublic of Adygea to Nevinomyssk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Reublic of Adygea
To
Nevinomyssk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
154 km
GEM pipeline ID
P2339
Start year
1964
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingReublic of Adygea → Nevinomyssk1552.5720 mm1964GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Maykop-Nevinnomyssk Gas Pipeline run?
Maykop-Nevinnomyssk Gas Pipeline runs from Reublic of Adygea to Nevinomyssk, crossing Russia.
How long is Maykop-Nevinnomyssk Gas Pipeline?
Maykop-Nevinnomyssk Gas Pipeline is 155 km long.
How much gas can Maykop-Nevinnomyssk Gas Pipeline carry?
Maykop-Nevinnomyssk Gas Pipeline has a design capacity of 2.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Maykop-Nevinnomyssk Gas Pipeline operating?
Maykop-Nevinnomyssk Gas Pipeline is operating, having started in 1964.
Who owns Maykop-Nevinnomyssk Gas Pipeline?
Maykop-Nevinnomyssk Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.