Gas transmission pipeline · Kunchanapalli to Ramagundam

Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline

Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is an operating gas transmission pipeline in India. The tracker lists 1 tracked segment, 365 km long and 28.56 bcm/y of capacity, starting up in 2021. It runs from Kunchanapalli to Ramagundam. It is owned by Gujarat State Petronet Ltd.

Length

365 km

Capacity

28.6 bcm/y

21.0 Mtpa LNG equivalent

Segments tracked

1

Route

Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline runs from Kunchanapalli to Ramagundam. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kunchanapalli
To
Ramagundam
Start country
India
End country
India
Countries crossed
India
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
338 km
GEM pipeline ID
P0938
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase IOperatingKunchanapalli → Ramagundam36528.62021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline run?
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline runs from Kunchanapalli to Ramagundam, crossing India.
How long is Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline?
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is 365 km long.
How much gas can Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline carry?
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline has a design capacity of 28.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline operating?
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is operating, having started in 2021.
Who owns Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline?
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is owned by Gujarat State Petronet Ltd, as recorded in the current tracker release.