Gas transmission pipeline · Mallavaram to Rajasthan
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is an under construction gas transmission pipeline in India. The tracker lists 1 tracked segment, 1,517 km long and 28.56 bcm/y of capacity, starting up in 2024. It runs from Mallavaram to Rajasthan. It is owned by Gujarat State Petronet Ltd.
Length
1,517 km
Capacity
28.6 bcm/y
21.0 Mtpa LNG equivalent
Segments tracked
1
Route
Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline runs from Mallavaram to Rajasthan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mallavaram
- To
- Rajasthan
- Start country
- India
- End country
- India
- Countries crossed
- India
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,491 km
- GEM pipeline ID
- P3602
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase II | Under construction | Mallavaram → Rajasthan | 1,517 | 28.6 | — | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline run?
- Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline runs from Mallavaram to Rajasthan, crossing India.
- How long is Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline?
- Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is 1,517 km long.
- How much gas can Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline carry?
- Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline has a design capacity of 28.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline operating?
- Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is under construction, with a reported start year of 2024.
- Who owns Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline?
- Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is owned by Gujarat State Petronet Ltd, as recorded in the current tracker release.