Gas transmission pipeline · Kuraimat Power Station to Cairo

Kuraimat- Al Tebbin Gas Pipeline

Kuraimat- Al Tebbin Gas Pipeline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 87 km long and 1.12 bcm/y of capacity. It runs from Kuraimat Power Station to Cairo.

Length

87 km

Capacity

1.12 bcm/y

0.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 559 mm (22 in)

Route

Kuraimat- Al Tebbin Gas Pipeline runs from Kuraimat Power Station to Cairo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kuraimat Power Station
To
Cairo
Start country
Egypt
End country
Egypt
Countries crossed
Egypt
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
55 km
GEM pipeline ID
P8021
Start year
Not reported
GEM wiki page
Not reported

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingKuraimat Power Station → Cairo871.12559 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Kuraimat- Al Tebbin Gas Pipeline run?
Kuraimat- Al Tebbin Gas Pipeline runs from Kuraimat Power Station to Cairo, crossing Egypt.
How long is Kuraimat- Al Tebbin Gas Pipeline?
Kuraimat- Al Tebbin Gas Pipeline is 87 km long.
How much gas can Kuraimat- Al Tebbin Gas Pipeline carry?
Kuraimat- Al Tebbin Gas Pipeline has a design capacity of 1.12 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Kuraimat- Al Tebbin Gas Pipeline operating?
Kuraimat- Al Tebbin Gas Pipeline is operating.
Who owns Kuraimat- Al Tebbin Gas Pipeline?
Ownership of Kuraimat- Al Tebbin Gas Pipeline is not reported in the current tracker release.