Gas transmission pipeline · Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd

Krasny Most-Sevkar-Berd Gas Pipeline

Krasny Most-Sevkar-Berd Gas Pipeline is an operating gas transmission pipeline in Armenia. The tracker lists 1 tracked segment, 62 km long and 1.71 bcm/y of capacity, starting up in 1993. It runs from Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd. It is owned by CJSC Gazprom Armenia.

Length

62 km

Capacity

1.71 bcm/y

1.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1000 mm (39 in)

Route

Krasny Most-Sevkar-Berd Gas Pipeline runs from Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi
To
Berd
Start country
Armenia
End country
Armenia
Countries crossed
Armenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
61 km
GEM pipeline ID
P4268
Start year
1993
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingKransy Most/ Qırmızı Körpü/ Tsiteli Khidi → Berd621.711000 mm1993GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Krasny Most-Sevkar-Berd Gas Pipeline run?
Krasny Most-Sevkar-Berd Gas Pipeline runs from Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd, crossing Armenia.
How long is Krasny Most-Sevkar-Berd Gas Pipeline?
Krasny Most-Sevkar-Berd Gas Pipeline is 62 km long.
How much gas can Krasny Most-Sevkar-Berd Gas Pipeline carry?
Krasny Most-Sevkar-Berd Gas Pipeline has a design capacity of 1.71 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Krasny Most-Sevkar-Berd Gas Pipeline operating?
Krasny Most-Sevkar-Berd Gas Pipeline is operating, having started in 1993.
Who owns Krasny Most-Sevkar-Berd Gas Pipeline?
Krasny Most-Sevkar-Berd Gas Pipeline is owned by CJSC Gazprom Armenia, as recorded in the current tracker release.