Gas transmission pipeline · Krasnodar to Serpukhov
Krasnodar Krai-Serpukhov Gas Pipeline
Krasnodar Krai-Serpukhov Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,177 km long, starting up in 1961. It runs from Krasnodar to Serpukhov. It is owned by Gazprom PJSC.
Length
1,177 km
Capacity
Not reported
Segments tracked
1
Largest diameter 820 mm (32 in)
Route
Krasnodar Krai-Serpukhov Gas Pipeline runs from Krasnodar to Serpukhov. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Krasnodar
- To
- Serpukhov
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 1,035 km
- GEM pipeline ID
- P5551
- Start year
- 1961
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| II | Operating | Krasnodar → Serpukhov | 1,177 | Not reported | 820 mm | 1961 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Krasnodar Krai-Serpukhov Gas Pipeline run?
- Krasnodar Krai-Serpukhov Gas Pipeline runs from Krasnodar to Serpukhov, crossing Russia.
- How long is Krasnodar Krai-Serpukhov Gas Pipeline?
- Krasnodar Krai-Serpukhov Gas Pipeline is 1,177 km long.
- How much gas can Krasnodar Krai-Serpukhov Gas Pipeline carry?
- No design capacity is reported for Krasnodar Krai-Serpukhov Gas Pipeline. That is an absent figure, not a zero.
- Is Krasnodar Krai-Serpukhov Gas Pipeline operating?
- Krasnodar Krai-Serpukhov Gas Pipeline is operating, having started in 1961.
- Who owns Krasnodar Krai-Serpukhov Gas Pipeline?
- Krasnodar Krai-Serpukhov Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.