Gas transmission pipeline · Korpeje to Kordkuy
Korpeje-Kordkuy Gas Pipeline
Korpeje-Kordkuy Gas Pipeline is an operating gas transmission pipeline crossing Turkmenistan, Iran. The tracker lists 1 tracked segment, 197 km long and 8 bcm/y of capacity, starting up in 1997. It runs from Korpeje to Kordkuy. It is owned by Turkmengaz and Iran Ministry of Petroleum.
Length
197 km
Capacity
8 bcm/y
5.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1000 mm (39 in)
Route
Korpeje-Kordkuy Gas Pipeline runs from Korpeje to Kordkuy. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Korpeje
- To
- Kordkuy
- Start country
- Turkmenistan
- End country
- Iran
- Countries crossed
- Turkmenistan, Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 63 km
- GEM pipeline ID
- P0749
- Start year
- 1997
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Korpeje → Kordkuy | 197 | 8 | 1000 mm | 1997 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Korpeje-Kordkuy Gas Pipeline run?
- Korpeje-Kordkuy Gas Pipeline runs from Korpeje to Kordkuy, crossing Turkmenistan and Iran.
- How long is Korpeje-Kordkuy Gas Pipeline?
- Korpeje-Kordkuy Gas Pipeline is 197 km long.
- How much gas can Korpeje-Kordkuy Gas Pipeline carry?
- Korpeje-Kordkuy Gas Pipeline has a design capacity of 8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Korpeje-Kordkuy Gas Pipeline operating?
- Korpeje-Kordkuy Gas Pipeline is operating, having started in 1997.
- Who owns Korpeje-Kordkuy Gas Pipeline?
- Korpeje-Kordkuy Gas Pipeline is owned by Iran Ministry of Petroleum and Turkmengaz, as recorded in the current tracker release.