Gas transmission pipeline · Bangladesh
Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline
Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline is a shelved gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 77 km long, starting up in 2029. It is owned by Gas Transmission Co Ltd (GTCL).
Length
77 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Khulna
- To
- Not reported
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 65 km
- GEM pipeline ID
- P3917
- Start year
- 2029
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Khulna → ? | 77 | Not reported | 762 mm | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline run?
- Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
- How long is Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline?
- Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline is 77 km long.
- How much gas can Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline carry?
- No design capacity is reported for Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline. That is an absent figure, not a zero.
- Is Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline operating?
- Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline is shelved, with a reported start year of 2029.
- Who owns Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline?
- Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.