Gas transmission pipeline · Khulna to Barishal
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is a shelved gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 110 km long, starting up in 2035. It runs from Khulna to Barishal. It is owned by Gas Transmission Co Ltd (GTCL).
Length
110 km
Capacity
Not reported
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project runs from Khulna to Barishal. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Khulna
- To
- Barishal
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 93 km
- GEM pipeline ID
- P3240
- Start year
- 2035
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Khulna → Barishal | 110 | Not reported | 914 mm | 2035 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project run?
- Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project runs from Khulna to Barishal, crossing Bangladesh.
- How long is Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project?
- Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is 110 km long.
- How much gas can Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project carry?
- No design capacity is reported for Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project. That is an absent figure, not a zero.
- Is Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project operating?
- Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is shelved, with a reported start year of 2035.
- Who owns Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project?
- Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.
- Does Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project serve an LNG terminal?
- Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.