Gas transmission pipeline · Kambalda to Esperance
Kambalda to Esperance Pipeline
Kambalda to Esperance Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 342 km long and 0.06 bcm/y of capacity, starting up in 1996. It runs from Kambalda to Esperance.
Length
342 km
Capacity
0.06 bcm/y
0.0 Mtpa LNG equivalent
Segments tracked
1
Route
Kambalda to Esperance Pipeline runs from Kambalda to Esperance. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kambalda
- To
- Esperance
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 342 km
- GEM pipeline ID
- P1164
- Start year
- 1996
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Kambalda → Esperance | 342 | 0.06 | — | 1996 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kambalda to Esperance Pipeline run?
- Kambalda to Esperance Pipeline runs from Kambalda to Esperance, crossing Australia.
- How long is Kambalda to Esperance Pipeline?
- Kambalda to Esperance Pipeline is 342 km long.
- How much gas can Kambalda to Esperance Pipeline carry?
- Kambalda to Esperance Pipeline has a design capacity of 0.06 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Kambalda to Esperance Pipeline operating?
- Kambalda to Esperance Pipeline is operating, having started in 1996.
- Who owns Kambalda to Esperance Pipeline?
- Ownership of Kambalda to Esperance Pipeline is not reported in the current tracker release.