Gas transmission pipeline · Binhai to Feidong
Jiangsu Coastal Gas Pipeline
Jiangsu Coastal Gas Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 515 km long and 12.7 bcm/y of capacity, starting up in 2022. It runs from Binhai to Feidong.
Length
515 km
Capacity
12.7 bcm/y
9.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1219914 mm (48028 in)
Route
Jiangsu Coastal Gas Pipeline runs from Binhai to Feidong. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Binhai
- To
- Feidong
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 445 km
- GEM pipeline ID
- P4775
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Binhai LNG Transport Pipeline (Binhai-Xuyi, Tianchang-Hefei) | Operating | Binhai → Feidong | 515 | 12.7 | 1219914 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Yancheng LNG Terminal | China | Import | Operating | 0 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | — | name match |
| Rudong LNG Terminal (Jiangsu Guoxin) | China | Import | Under construction | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Jiangsu Coastal Gas Pipeline run?
- Jiangsu Coastal Gas Pipeline runs from Binhai to Feidong, crossing China.
- How long is Jiangsu Coastal Gas Pipeline?
- Jiangsu Coastal Gas Pipeline is 515 km long.
- How much gas can Jiangsu Coastal Gas Pipeline carry?
- Jiangsu Coastal Gas Pipeline has a design capacity of 12.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Jiangsu Coastal Gas Pipeline operating?
- Jiangsu Coastal Gas Pipeline is operating, having started in 2022.
- Who owns Jiangsu Coastal Gas Pipeline?
- Ownership of Jiangsu Coastal Gas Pipeline is not reported in the current tracker release.
- Does Jiangsu Coastal Gas Pipeline serve an LNG terminal?
- Jiangsu Coastal Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.