Gas transmission pipeline · Siziwang Banner to Wuchuan
Inner Mongolia Gas Pipeline Network
Inner Mongolia Gas Pipeline Network is a proposed gas transmission pipeline in China. The tracker lists 1 tracked segment, 60 km long and 0.4 bcm/y of capacity, starting up in 2026. It runs from Siziwang Banner to Wuchuan.
Length
60 km
Capacity
0.4 bcm/y
0.3 Mtpa LNG equivalent
Segments tracked
1
Route
Inner Mongolia Gas Pipeline Network runs from Siziwang Banner to Wuchuan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Siziwang Banner
- To
- Wuchuan
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 55 km
- GEM pipeline ID
- P4545
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Siziwang Banner-Wuchuan Gas Pipeline | Proposed | Siziwang Banner → Wuchuan | 60 | 0.4 | — | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Inner Mongolia Gas Pipeline Network run?
- Inner Mongolia Gas Pipeline Network runs from Siziwang Banner to Wuchuan, crossing China.
- How long is Inner Mongolia Gas Pipeline Network?
- Inner Mongolia Gas Pipeline Network is 60 km long.
- How much gas can Inner Mongolia Gas Pipeline Network carry?
- Inner Mongolia Gas Pipeline Network has a design capacity of 0.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Inner Mongolia Gas Pipeline Network operating?
- Inner Mongolia Gas Pipeline Network is proposed, with a reported start year of 2026.
- Who owns Inner Mongolia Gas Pipeline Network?
- Ownership of Inner Mongolia Gas Pipeline Network is not reported in the current tracker release.