Igrim-Serov-Nizhny Tagil Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 525 km long and 10 bcm/y of capacity, starting up in 1966. It runs from Igrim to Nizhny Tagil. It is owned by Gazprom PJSC.

Length

525 km

Capacity

10 bcm/y

7.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1000 mm (39 in)

Route

Igrim-Serov-Nizhny Tagil Gas Pipeline runs from Igrim to Nizhny Tagil. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Igrim
To
Nizhny Tagil
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
639 km
GEM pipeline ID
P2315
Start year
1966
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingIgrim → Nizhny Tagil525101000 mm1966GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Igrim-Serov-Nizhny Tagil Gas Pipeline run?
Igrim-Serov-Nizhny Tagil Gas Pipeline runs from Igrim to Nizhny Tagil, crossing Russia.
How long is Igrim-Serov-Nizhny Tagil Gas Pipeline?
Igrim-Serov-Nizhny Tagil Gas Pipeline is 525 km long.
How much gas can Igrim-Serov-Nizhny Tagil Gas Pipeline carry?
Igrim-Serov-Nizhny Tagil Gas Pipeline has a design capacity of 10 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Igrim-Serov-Nizhny Tagil Gas Pipeline operating?
Igrim-Serov-Nizhny Tagil Gas Pipeline is operating, having started in 1966.
Who owns Igrim-Serov-Nizhny Tagil Gas Pipeline?
Igrim-Serov-Nizhny Tagil Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.