Gas transmission pipeline · Hassi R'Mel to Arzew
Hassi R'Mel-Arzew Gas Pipeline
Hassi R'Mel-Arzew Gas Pipeline is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 509 km long and 6.67 bcm/y of capacity, starting up in 1961. It runs from Hassi R'Mel to Arzew. It is owned by Sonatrach SpA.
Length
509 km
Capacity
6.67 bcm/y
4.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 51410 mm (2024 in)
Route
Hassi R'Mel-Arzew Gas Pipeline runs from Hassi R'Mel to Arzew. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hassi R'Mel
- To
- Arzew
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 505 km
- GEM pipeline ID
- P0466
- Start year
- 1961
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Mainline | Operating | Hassi R'Mel → Arzew | 509 | 6.67 | 51410 mm | 1961 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Arzew-Bethioua LNG Terminal | Algeria | Export | Operating | 2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Sonatrach SpA100%
Parent companies
- Sonatrach SpA100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hassi R'Mel-Arzew Gas Pipeline run?
- Hassi R'Mel-Arzew Gas Pipeline runs from Hassi R'Mel to Arzew, crossing Algeria.
- How long is Hassi R'Mel-Arzew Gas Pipeline?
- Hassi R'Mel-Arzew Gas Pipeline is 509 km long.
- How much gas can Hassi R'Mel-Arzew Gas Pipeline carry?
- Hassi R'Mel-Arzew Gas Pipeline has a design capacity of 6.67 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Hassi R'Mel-Arzew Gas Pipeline operating?
- Hassi R'Mel-Arzew Gas Pipeline is operating, having started in 1961.
- Who owns Hassi R'Mel-Arzew Gas Pipeline?
- Hassi R'Mel-Arzew Gas Pipeline is owned by Sonatrach SpA, as recorded in the current tracker release.
- Does Hassi R'Mel-Arzew Gas Pipeline serve an LNG terminal?
- Hassi R'Mel-Arzew Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.