LNG Chain

Gas transmission pipeline · Gurdaspur to Jammu

Gurdaspur-Jammu Gas Pipeline

Gurdaspur-Jammu Gas Pipeline is an under construction gas transmission pipeline in India. The tracker lists 1 tracked segment, 175 km long and 0.73 bcm/y of capacity, starting up in 2026. It runs from Gurdaspur to Jammu.

Length

175 km

Capacity

0.73 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Route

Gurdaspur-Jammu Gas Pipeline runs from Gurdaspur to Jammu. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gurdaspur
To
Jammu
Start country
India
End country
India
Countries crossed
India
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
136 km
GEM pipeline ID
P5413
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionGurdaspur → Jammu1750.732026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Gurdaspur-Jammu Gas Pipeline run?
Gurdaspur-Jammu Gas Pipeline runs from Gurdaspur to Jammu, crossing India.
How long is Gurdaspur-Jammu Gas Pipeline?
Gurdaspur-Jammu Gas Pipeline is 175 km long.
How much gas can Gurdaspur-Jammu Gas Pipeline carry?
Gurdaspur-Jammu Gas Pipeline has a design capacity of 0.73 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Gurdaspur-Jammu Gas Pipeline operating?
Gurdaspur-Jammu Gas Pipeline is under construction, with a reported start year of 2026.
Who owns Gurdaspur-Jammu Gas Pipeline?
Ownership of Gurdaspur-Jammu Gas Pipeline is not reported in the current tracker release.