Gas transmission pipeline · Gdansk to Ploty
Goleniow–Gdynia Gas Pipeline
Goleniow–Gdynia Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 278 km long. It runs from Gdansk to Ploty. It is owned by Gaz-System.
Length
278 km
Capacity
Not reported
Segments tracked
1
Route
Goleniow–Gdynia Gas Pipeline runs from Gdansk to Ploty. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Gdansk
- To
- Ploty
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 278 km
- GEM pipeline ID
- P2879
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Gdansk → Ploty | 278 | Not reported | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Polish Baltic Sea Coast FSRU | Poland | Import | Under construction | 10.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Goleniow–Gdynia Gas Pipeline run?
- Goleniow–Gdynia Gas Pipeline runs from Gdansk to Ploty, crossing Poland.
- How long is Goleniow–Gdynia Gas Pipeline?
- Goleniow–Gdynia Gas Pipeline is 278 km long.
- How much gas can Goleniow–Gdynia Gas Pipeline carry?
- No design capacity is reported for Goleniow–Gdynia Gas Pipeline. That is an absent figure, not a zero.
- Is Goleniow–Gdynia Gas Pipeline operating?
- Goleniow–Gdynia Gas Pipeline is operating.
- Who owns Goleniow–Gdynia Gas Pipeline?
- Goleniow–Gdynia Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.
- Does Goleniow–Gdynia Gas Pipeline serve an LNG terminal?
- Goleniow–Gdynia Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.