LNG Chain

Gas transmission pipeline · Fairview, Roma, Arcadia, Comet Ridge and Scotia to Curtis Island

GLNG Pipeline

GLNG Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 435 km long and 13.85 bcm/y of capacity, starting up in 2014. It runs from Fairview, Roma, Arcadia, Comet Ridge and Scotia to Curtis Island. Owners include Santos Ltd, Petronas International Co Ltd, TotalEnergies and 1 more.

Length

435 km

Capacity

13.8 bcm/y

10.2 Mtpa LNG equivalent

Segments tracked

1

Route

GLNG Pipeline runs from Fairview, Roma, Arcadia, Comet Ridge and Scotia to Curtis Island. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Fairview, Roma, Arcadia, Comet Ridge and Scotia
To
Curtis Island
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
401 km
GEM pipeline ID
P1157
Start year
2014
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingFairview, Roma, Arcadia, Comet Ridge and Scotia → Curtis Island43513.82014GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Fishermans Landing LNG TerminalAustraliaExportCancelled7 kmroute proximity
Australia Pacific LNG TerminalAustraliaExportOperating7.7 kmroute proximity
Queensland Curtis LNG TerminalAustraliaExportOperating8.8 kmroute proximity
Gladstone LNG TerminalAustraliaExportOperating10.1 kmroute proximity
Arrow Energy LNG TerminalAustraliaExportCancelled12.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does GLNG Pipeline run?
GLNG Pipeline runs from Fairview, Roma, Arcadia, Comet Ridge and Scotia to Curtis Island, crossing Australia.
How long is GLNG Pipeline?
GLNG Pipeline is 435 km long.
How much gas can GLNG Pipeline carry?
GLNG Pipeline has a design capacity of 13.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is GLNG Pipeline operating?
GLNG Pipeline is operating, having started in 2014.
Who owns GLNG Pipeline?
GLNG Pipeline is owned by Santos Ltd, Petronas International Co Ltd, TotalEnergies and 1 other, as recorded in the current tracker release.
Does GLNG Pipeline serve an LNG terminal?
GLNG Pipeline passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.