Gas transmission pipeline · Carthage to Beaumont
Gemini Gulf Coast Pipeline
Gemini Gulf Coast Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 241 km long and 15.33 bcm/y of capacity, starting up in 2022. It runs from Carthage to Beaumont. It is owned by Gemini Gulf Coast Pipeline LLC.
Length
241 km
Capacity
15.3 bcm/y
11.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Gemini Gulf Coast Pipeline runs from Carthage to Beaumont. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Carthage
- To
- Beaumont
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 250 km
- GEM pipeline ID
- P1317
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Carthage → Beaumont | 241 | 15.3 | 914 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Phillips 66 Beamont Oil Terminal | United States | Export | Operating | 22 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gemini Gulf Coast Pipeline run?
- Gemini Gulf Coast Pipeline runs from Carthage to Beaumont, crossing United States.
- How long is Gemini Gulf Coast Pipeline?
- Gemini Gulf Coast Pipeline is 241 km long.
- How much gas can Gemini Gulf Coast Pipeline carry?
- Gemini Gulf Coast Pipeline has a design capacity of 15.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gemini Gulf Coast Pipeline operating?
- Gemini Gulf Coast Pipeline is cancelled, with a reported start year of 2022.
- Who owns Gemini Gulf Coast Pipeline?
- Gemini Gulf Coast Pipeline is owned by Gemini Gulf Coast Pipeline LLC, as recorded in the current tracker release.
- Does Gemini Gulf Coast Pipeline serve an LNG terminal?
- Gemini Gulf Coast Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.