Gas transmission pipeline · Humay to Mollendo, Ilo, Arequipa
Gasoducto Costero Gas Pipeline
Gasoducto Costero Gas Pipeline is a proposed gas transmission pipeline in Peru. The tracker lists 1 tracked segment, 923 km long and 3.58 bcm/y of capacity, starting up in 2028. It runs from Humay to Mollendo, Ilo, Arequipa. It is owned by TGP (Transportadora de Gas del Peru).
Length
923 km
Capacity
3.58 bcm/y
2.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Gasoducto Costero Gas Pipeline runs from Humay to Mollendo, Ilo, Arequipa. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Humay
- To
- Mollendo, Ilo, Arequipa
- Start country
- Peru
- End country
- Peru
- Countries crossed
- Peru
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 910 km
- GEM pipeline ID
- P7449
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Humay → Mollendo, Ilo, Arequipa | 923 | 3.58 | 610 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ilo LNG Terminal | Peru | Export | Cancelled | 12.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.