Gas transmission pipeline · Wysokoje to Jauniūnai
Gas Interconnection Poland-Lithuania
Gas Interconnection Poland-Lithuania is an operating gas transmission pipeline crossing Poland, Lithuania. The tracker lists 1 tracked segment, 508 km long and 2.4 bcm/y of capacity, starting up in 2022. It runs from Wysokoje to Jauniūnai. It is owned by AB Amber Grid and Gaz-System.
Length
508 km
Capacity
2.4 bcm/y
1.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 711 mm (28 in)
Route
Gas Interconnection Poland-Lithuania runs from Wysokoje to Jauniūnai. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Wysokoje
- To
- Jauniūnai
- Start country
- Poland
- End country
- Lithuania
- Countries crossed
- Poland, Lithuania
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 432 km
- GEM pipeline ID
- P0695
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Polish and Lithuanian Sections | Operating | Wysokoje → Jauniūnai | 508 | 2.4 | 711 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gas Interconnection Poland-Lithuania run?
- Gas Interconnection Poland-Lithuania runs from Wysokoje to Jauniūnai, crossing Poland and Lithuania.
- How long is Gas Interconnection Poland-Lithuania?
- Gas Interconnection Poland-Lithuania is 508 km long.
- How much gas can Gas Interconnection Poland-Lithuania carry?
- Gas Interconnection Poland-Lithuania has a design capacity of 2.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gas Interconnection Poland-Lithuania operating?
- Gas Interconnection Poland-Lithuania is operating, having started in 2022.
- Who owns Gas Interconnection Poland-Lithuania?
- Gas Interconnection Poland-Lithuania is owned by AB Amber Grid and Gaz-System, as recorded in the current tracker release.