Gas transmission pipeline · Escravos to Oben node
Escravos-Warri-Oben Gas Pipeline
Escravos-Warri-Oben Gas Pipeline is an operating gas transmission pipeline in Nigeria. The tracker lists 1 tracked segment, 110 km long and 1.53 bcm/y of capacity. It runs from Escravos to Oben node. It is owned by Nigerian National Petroleum Corp.
Length
110 km
Capacity
1.53 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Route
Escravos-Warri-Oben Gas Pipeline runs from Escravos to Oben node. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Escravos
- To
- Oben node
- Start country
- Nigeria
- End country
- Nigeria
- Countries crossed
- Nigeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 108 km
- GEM pipeline ID
- P0486
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Escravos → Oben node | 110 | 1.53 | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ace Gas Nigeria FLNG Terminal | Nigeria | Export | Proposed | 14.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- NNPC Ltd100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Escravos-Warri-Oben Gas Pipeline run?
- Escravos-Warri-Oben Gas Pipeline runs from Escravos to Oben node, crossing Nigeria.
- How long is Escravos-Warri-Oben Gas Pipeline?
- Escravos-Warri-Oben Gas Pipeline is 110 km long.
- How much gas can Escravos-Warri-Oben Gas Pipeline carry?
- Escravos-Warri-Oben Gas Pipeline has a design capacity of 1.53 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Escravos-Warri-Oben Gas Pipeline operating?
- Escravos-Warri-Oben Gas Pipeline is operating.
- Who owns Escravos-Warri-Oben Gas Pipeline?
- Escravos-Warri-Oben Gas Pipeline is owned by Nigerian National Petroleum Corp, as recorded in the current tracker release.
- Does Escravos-Warri-Oben Gas Pipeline serve an LNG terminal?
- Escravos-Warri-Oben Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.