Gas transmission pipeline · Escravos to Lagos

Escravos-Lagos Pipeline System (ELPS)

Escravos-Lagos Pipeline System (ELPS) is an operating gas transmission pipeline in Nigeria. The tracker lists 1 tracked segment, 342 km long and 11.24 bcm/y of capacity, starting up in 2021. It runs from Escravos to Lagos. It is owned by Nigerian National Petroleum Corp.

Length

342 km

Capacity

11.2 bcm/y

8.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Escravos-Lagos Pipeline System (ELPS) runs from Escravos to Lagos. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Escravos
To
Lagos
Start country
Nigeria
End country
Nigeria
Countries crossed
Nigeria
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
485 km
GEM pipeline ID
P2256
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Expansion (ELPS II)OperatingEscravos → Lagos34211.2914 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Golar Lagos FSRUNigeriaImportCancelled5.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Escravos-Lagos Pipeline System (ELPS) run?
Escravos-Lagos Pipeline System (ELPS) runs from Escravos to Lagos, crossing Nigeria.
How long is Escravos-Lagos Pipeline System (ELPS)?
Escravos-Lagos Pipeline System (ELPS) is 342 km long.
How much gas can Escravos-Lagos Pipeline System (ELPS) carry?
Escravos-Lagos Pipeline System (ELPS) has a design capacity of 11.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Escravos-Lagos Pipeline System (ELPS) operating?
Escravos-Lagos Pipeline System (ELPS) is operating, having started in 2021.
Who owns Escravos-Lagos Pipeline System (ELPS)?
Escravos-Lagos Pipeline System (ELPS) is owned by Nigerian National Petroleum Corp, as recorded in the current tracker release.
Does Escravos-Lagos Pipeline System (ELPS) serve an LNG terminal?
Escravos-Lagos Pipeline System (ELPS) passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.