Gas transmission pipeline · Elenga to Tarakandi
Elenga-Tarakandi Gas Pipeline
Elenga-Tarakandi Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 42 km long and 0.82 bcm/y of capacity, starting up in 1991. It runs from Elenga to Tarakandi. It is owned by Titas Gas Transmission and Distribution Co (TGTDCL).
Length
42 km
Capacity
0.82 bcm/y
0.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 305 mm (12 in)
Route
Elenga-Tarakandi Gas Pipeline runs from Elenga to Tarakandi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Elenga
- To
- Tarakandi
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 40 km
- GEM pipeline ID
- P0856
- Start year
- 1991
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Elenga → Tarakandi | 42 | 0.82 | 305 mm | 1991 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Elenga-Tarakandi Gas Pipeline run?
- Elenga-Tarakandi Gas Pipeline runs from Elenga to Tarakandi, crossing Bangladesh.
- How long is Elenga-Tarakandi Gas Pipeline?
- Elenga-Tarakandi Gas Pipeline is 42 km long.
- How much gas can Elenga-Tarakandi Gas Pipeline carry?
- Elenga-Tarakandi Gas Pipeline has a design capacity of 0.82 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Elenga-Tarakandi Gas Pipeline operating?
- Elenga-Tarakandi Gas Pipeline is operating, having started in 1991.
- Who owns Elenga-Tarakandi Gas Pipeline?
- Elenga-Tarakandi Gas Pipeline is owned by Titas Gas Transmission and Distribution Co (TGTDCL), as recorded in the current tracker release.