Gas transmission pipeline · Ashkelon to El Arish
El Arish–Ashkelon Pipeline
El Arish–Ashkelon Pipeline is an operating gas transmission pipeline crossing Israel, Egypt. The tracker lists 1 tracked segment, 90 km long and 7 bcm/y of capacity, starting up in 2008. It runs from Ashkelon to El Arish. It is owned by East Mediterranean Gas Co and EMED.
Length
90 km
Capacity
7 bcm/y
5.1 Mtpa LNG equivalent
Segments tracked
1
Route
El Arish–Ashkelon Pipeline runs from Ashkelon to El Arish. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ashkelon
- To
- El Arish
- Start country
- Israel
- End country
- Egypt
- Countries crossed
- Israel, Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 106 km
- GEM pipeline ID
- P0462
- Start year
- 2008
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Ashkelon → El Arish | 90 | 7 | — | 2008 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Chevron33.54%
- Egyptian Natural Gas Holding Co19.5%
- NewMed Energy LP9.75%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does El Arish–Ashkelon Pipeline run?
- El Arish–Ashkelon Pipeline runs from Ashkelon to El Arish, crossing Israel and Egypt.
- How long is El Arish–Ashkelon Pipeline?
- El Arish–Ashkelon Pipeline is 90 km long.
- How much gas can El Arish–Ashkelon Pipeline carry?
- El Arish–Ashkelon Pipeline has a design capacity of 7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is El Arish–Ashkelon Pipeline operating?
- El Arish–Ashkelon Pipeline is operating, having started in 2008.
- Who owns El Arish–Ashkelon Pipeline?
- El Arish–Ashkelon Pipeline is owned by East Mediterranean Gas Co and EMED, as recorded in the current tracker release.