LNG Chain

Gas transmission pipeline · Israel – Cyprus – Greece

EastMed Gas Pipeline

EastMed Gas Pipeline is a proposed gas transmission pipeline crossing Israel, Cyprus, Greece. The tracker lists 1 tracked segment, 165 km long and 10 bcm/y of capacity, starting up in 2025. It is owned by IGI Poseidon SA.

Length

165 km

Capacity

10 bcm/y

7.4 Mtpa LNG equivalent

Segments tracked

1

Route

EastMed Gas Pipeline runs from Israel – Cyprus – Greece. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Offshore
To
Not reported
Start country
Israel
End country
Cyprus
Countries crossed
Israel, Cyprus, Greece
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,736 km
GEM pipeline ID
P0827
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
SYSTEM/NETWORK ROUTEProposedOffshore → ?165102025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Hoegh Cyprus FSRUCyprusImportCancelled17.1 kmroute proximity
Cyprus FSRUCyprusImportShelved18.1 kmroute proximity
Cyprus LNG TerminalCyprusExportCancelled19.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does EastMed Gas Pipeline run?
EastMed Gas Pipeline runs from Israel to Cyprus, crossing Israel, Cyprus and Greece.
How long is EastMed Gas Pipeline?
EastMed Gas Pipeline is 165 km long.
How much gas can EastMed Gas Pipeline carry?
EastMed Gas Pipeline has a design capacity of 10 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is EastMed Gas Pipeline operating?
EastMed Gas Pipeline is proposed, with a reported start year of 2025.
Who owns EastMed Gas Pipeline?
EastMed Gas Pipeline is owned by IGI Poseidon SA, as recorded in the current tracker release.
Does EastMed Gas Pipeline serve an LNG terminal?
EastMed Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.