LNG Chain

Gas transmission pipeline · Longford to Cooma, Canberra, Wollongon, Sydney

Eastern Gas Pipeline

Eastern Gas Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 797 km long and 3.44 bcm/y of capacity, starting up in 2000. It runs from Longford to Cooma, Canberra, Wollongon, Sydney. It is owned by Jemena.

Length

797 km

Capacity

3.44 bcm/y

2.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 457 mm (18 in)

Route

Eastern Gas Pipeline runs from Longford to Cooma, Canberra, Wollongon, Sydney. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Longford
To
Cooma, Canberra, Wollongon, Sydney
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
739 km
GEM pipeline ID
P1153
Start year
2000
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Main LineOperatingLongford → Cooma, Canberra, Wollongon, Sydney7973.44457 mm2000GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Longford LNG TerminalAustraliaImportCancelled3.7 kmroute proximity
Port Kembla FSRUAustraliaImportUnder construction8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Eastern Gas Pipeline run?
Eastern Gas Pipeline runs from Longford to Cooma, Canberra, Wollongon, Sydney, crossing Australia.
How long is Eastern Gas Pipeline?
Eastern Gas Pipeline is 797 km long.
How much gas can Eastern Gas Pipeline carry?
Eastern Gas Pipeline has a design capacity of 3.44 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Eastern Gas Pipeline operating?
Eastern Gas Pipeline is operating, having started in 2000.
Who owns Eastern Gas Pipeline?
Eastern Gas Pipeline is owned by Jemena, as recorded in the current tracker release.
Does Eastern Gas Pipeline serve an LNG terminal?
Eastern Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.