Gas transmission pipeline · Libya
DP3–DP4 Gas Pipeline
DP3–DP4 Gas Pipeline is an under construction gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 28 km long, starting up in 2028. It is owned by Libyan National Oil Corp and Eni.
Length
28 km
Capacity
Not reported
Segments tracked
1
Largest diameter 356 mm (14 in)
Route
DP3–DP4 Gas Pipeline runs from Libya. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Sabratha platform
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 25 km
- GEM pipeline ID
- P6716
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| DP3–DP4 | Under construction | ? → Sabratha platform | 28 | Not reported | 356 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Eni50%
- National Oil Corp50%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does DP3–DP4 Gas Pipeline run?
- DP3–DP4 Gas Pipeline is recorded in Libya. Global Energy Monitor reports no start and end points for it.
- How long is DP3–DP4 Gas Pipeline?
- DP3–DP4 Gas Pipeline is 28 km long.
- How much gas can DP3–DP4 Gas Pipeline carry?
- No design capacity is reported for DP3–DP4 Gas Pipeline. That is an absent figure, not a zero.
- Is DP3–DP4 Gas Pipeline operating?
- DP3–DP4 Gas Pipeline is under construction, with a reported start year of 2028.
- Who owns DP3–DP4 Gas Pipeline?
- DP3–DP4 Gas Pipeline is owned by Eni and Libyan National Oil Corp, as recorded in the current tracker release.