Gas transmission pipeline · Poker Lake Metering Station to Lea County

Double E Pipeline Project

Double E Pipeline Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 32 km long and 6.13 bcm/y of capacity, starting up in 2023. It runs from Poker Lake Metering Station to Lea County. It is owned by Summit Midstream Partners LP and ExxonMobil.

Length

32 km

Capacity

6.13 bcm/y

4.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Double E Pipeline Project runs from Poker Lake Metering Station to Lea County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Poker Lake Metering Station
To
Lea County
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
32 km
GEM pipeline ID
P5727
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Red Hills LateralProposedPoker Lake Metering Station → Lea County326.13610 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match