Gas transmission pipeline · Chifeng to Gaoliying
Datang-Hexigten Coal Gasification Transmission Pipeline
Datang-Hexigten Coal Gasification Transmission Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 345 km long and 4.38 bcm/y of capacity, starting up in 2013. It runs from Chifeng to Gaoliying. It is owned by Petrochina Beijing Gas Pipeline Co Ltd.
Length
345 km
Capacity
4.38 bcm/y
3.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Datang-Hexigten Coal Gasification Transmission Pipeline runs from Chifeng to Gaoliying. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chifeng
- To
- Gaoliying
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 321 km
- GEM pipeline ID
- P5093
- Start year
- 2013
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Chifeng → Gaoliying | 345 | 4.38 | 914 mm | 2013 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Datang-Hexigten Coal Gasification Transmission Pipeline run?
- Datang-Hexigten Coal Gasification Transmission Pipeline runs from Chifeng to Gaoliying, crossing China.
- How long is Datang-Hexigten Coal Gasification Transmission Pipeline?
- Datang-Hexigten Coal Gasification Transmission Pipeline is 345 km long.
- How much gas can Datang-Hexigten Coal Gasification Transmission Pipeline carry?
- Datang-Hexigten Coal Gasification Transmission Pipeline has a design capacity of 4.38 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Datang-Hexigten Coal Gasification Transmission Pipeline operating?
- Datang-Hexigten Coal Gasification Transmission Pipeline is operating, having started in 2013.
- Who owns Datang-Hexigten Coal Gasification Transmission Pipeline?
- Datang-Hexigten Coal Gasification Transmission Pipeline is owned by Petrochina Beijing Gas Pipeline Co Ltd, as recorded in the current tracker release.