Gas transmission pipeline · Dandewala to Rajasthan
Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline
Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline is an operating gas transmission pipeline in India. The tracker lists 1 tracked segment, 65 km long and 0.03 bcm/y of capacity, starting up in 2012. It runs from Dandewala to Rajasthan. It is owned by GAIL (India) Ltd.
Length
65 km
Capacity
0.03 bcm/y
0.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 305 mm (12 in)
Route
Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline runs from Dandewala to Rajasthan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Dandewala
- To
- Rajasthan
- Start country
- India
- End country
- India
- Countries crossed
- India
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 322 km
- GEM pipeline ID
- P3905
- Start year
- 2012
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Dandewala → Rajasthan | 65 | 0.03 | 305 mm | 2012 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- GAIL (India) Ltd100%
Parent companies
- GAIL (India) Ltd100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline run?
- Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline runs from Dandewala to Rajasthan, crossing India.
- How long is Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline?
- Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline is 65 km long.
- How much gas can Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline carry?
- Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline has a design capacity of 0.03 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline operating?
- Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline is operating, having started in 2012.
- Who owns Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline?
- Dandewala-Gamnewala-RSEB Ramgarh Gas Pipeline is owned by GAIL (India) Ltd, as recorded in the current tracker release.