LNG Chain

Gas transmission pipeline · Crib Point to Pakenham

Crib Point Pakenham Pipeline

Crib Point Pakenham Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 60 km long and 98.2 bcm/y of capacity, starting up in 2023. It runs from Crib Point to Pakenham. It is owned by AGL Energy Ltd and APA Corp.

Length

60 km

Capacity

98.2 bcm/y

72.2 Mtpa LNG equivalent

Segments tracked

1

Route

Crib Point Pakenham Pipeline runs from Crib Point to Pakenham. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Crib Point
To
Pakenham
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
47 km
GEM pipeline ID
P1305
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledCrib Point → Pakenham6098.22023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Crib Point FSRU TerminalAustraliaImportCancelled1.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.