Gas transmission pipeline · Crib Point to Pakenham
Crib Point Pakenham Pipeline
Crib Point Pakenham Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 60 km long and 98.2 bcm/y of capacity, starting up in 2023. It runs from Crib Point to Pakenham. It is owned by AGL Energy Ltd and APA Corp.
Length
60 km
Capacity
98.2 bcm/y
72.2 Mtpa LNG equivalent
Segments tracked
1
Route
Crib Point Pakenham Pipeline runs from Crib Point to Pakenham. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Crib Point
- To
- Pakenham
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 47 km
- GEM pipeline ID
- P1305
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Crib Point → Pakenham | 60 | 98.2 | — | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Crib Point FSRU Terminal | Australia | Import | Cancelled | 1.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.