LNG Chain

Gas transmission pipeline · Tianjin to Dingxing

CNOOC Coal Gasification Transmission Pipeline

CNOOC Coal Gasification Transmission Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 414 km long and 6.6 bcm/y of capacity, starting up in 2023. It runs from Tianjin to Dingxing.

Length

414 km

Capacity

6.6 bcm/y

4.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

CNOOC Coal Gasification Transmission Pipeline runs from Tianjin to Dingxing. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tianjin
To
Dingxing
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
154 km
GEM pipeline ID
P7713
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
First phase (Tianjin-Dingxing)OperatingTianjin → Dingxing4146.61016 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Tianjin LNG Terminal (PipeChina)ChinaImportOperating20.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does CNOOC Coal Gasification Transmission Pipeline run?
CNOOC Coal Gasification Transmission Pipeline runs from Tianjin to Dingxing, crossing China.
How long is CNOOC Coal Gasification Transmission Pipeline?
CNOOC Coal Gasification Transmission Pipeline is 414 km long.
How much gas can CNOOC Coal Gasification Transmission Pipeline carry?
CNOOC Coal Gasification Transmission Pipeline has a design capacity of 6.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is CNOOC Coal Gasification Transmission Pipeline operating?
CNOOC Coal Gasification Transmission Pipeline is operating, having started in 2023.
Who owns CNOOC Coal Gasification Transmission Pipeline?
Ownership of CNOOC Coal Gasification Transmission Pipeline is not reported in the current tracker release.
Does CNOOC Coal Gasification Transmission Pipeline serve an LNG terminal?
CNOOC Coal Gasification Transmission Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.