Gas transmission pipeline · Chainsa to Hissar
Chainsa-Jhajjar-Hissar Gas Pipeline
Chainsa-Jhajjar-Hissar Gas Pipeline is an operating gas transmission pipeline in India. The tracker lists 1 tracked segment, 455 km long and 12.78 bcm/y of capacity, starting up in 2023. It runs from Chainsa to Hissar. It is owned by GAIL (India) Ltd.
Length
455 km
Capacity
12.8 bcm/y
9.4 Mtpa LNG equivalent
Segments tracked
1
Route
Chainsa-Jhajjar-Hissar Gas Pipeline runs from Chainsa to Hissar. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chainsa
- To
- Hissar
- Start country
- India
- End country
- India
- Countries crossed
- India
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 247 km
- GEM pipeline ID
- P0912
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Chainsa → Hissar | 455 | 12.8 | — | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- GAIL (India) Ltd100%
Parent companies
- GAIL (India) Ltd100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Chainsa-Jhajjar-Hissar Gas Pipeline run?
- Chainsa-Jhajjar-Hissar Gas Pipeline runs from Chainsa to Hissar, crossing India.
- How long is Chainsa-Jhajjar-Hissar Gas Pipeline?
- Chainsa-Jhajjar-Hissar Gas Pipeline is 455 km long.
- How much gas can Chainsa-Jhajjar-Hissar Gas Pipeline carry?
- Chainsa-Jhajjar-Hissar Gas Pipeline has a design capacity of 12.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Chainsa-Jhajjar-Hissar Gas Pipeline operating?
- Chainsa-Jhajjar-Hissar Gas Pipeline is operating, having started in 2023.
- Who owns Chainsa-Jhajjar-Hissar Gas Pipeline?
- Chainsa-Jhajjar-Hissar Gas Pipeline is owned by GAIL (India) Ltd, as recorded in the current tracker release.