LNG Chain

Gas transmission pipeline · Chainsa to Hissar

Chainsa-Jhajjar-Hissar Gas Pipeline

Chainsa-Jhajjar-Hissar Gas Pipeline is an operating gas transmission pipeline in India. The tracker lists 1 tracked segment, 455 km long and 12.78 bcm/y of capacity, starting up in 2023. It runs from Chainsa to Hissar. It is owned by GAIL (India) Ltd.

Length

455 km

Capacity

12.8 bcm/y

9.4 Mtpa LNG equivalent

Segments tracked

1

Route

Chainsa-Jhajjar-Hissar Gas Pipeline runs from Chainsa to Hissar. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Chainsa
To
Hissar
Start country
India
End country
India
Countries crossed
India
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
247 km
GEM pipeline ID
P0912
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingChainsa → Hissar45512.82023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Chainsa-Jhajjar-Hissar Gas Pipeline run?
Chainsa-Jhajjar-Hissar Gas Pipeline runs from Chainsa to Hissar, crossing India.
How long is Chainsa-Jhajjar-Hissar Gas Pipeline?
Chainsa-Jhajjar-Hissar Gas Pipeline is 455 km long.
How much gas can Chainsa-Jhajjar-Hissar Gas Pipeline carry?
Chainsa-Jhajjar-Hissar Gas Pipeline has a design capacity of 12.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Chainsa-Jhajjar-Hissar Gas Pipeline operating?
Chainsa-Jhajjar-Hissar Gas Pipeline is operating, having started in 2023.
Who owns Chainsa-Jhajjar-Hissar Gas Pipeline?
Chainsa-Jhajjar-Hissar Gas Pipeline is owned by GAIL (India) Ltd, as recorded in the current tracker release.