Gas transmission pipeline · Victoria to Iona
Casino to Iona Pipeline
Casino to Iona Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 46 km long and 1.06 bcm/y of capacity, starting up in 2006. It runs from Victoria to Iona. It is owned by Santos Ltd and Mitsui & Co..
Length
46 km
Capacity
1.06 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Route
Casino to Iona Pipeline runs from Victoria to Iona. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Victoria
- To
- Iona
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 28 km
- GEM pipeline ID
- P1202
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Victoria → Iona | 46 | 1.06 | — | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Mitsui & Co.50%
- Santos Ltd50%
Parent companies
- Santos Ltd50%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Casino to Iona Pipeline run?
- Casino to Iona Pipeline runs from Victoria to Iona, crossing Australia.
- How long is Casino to Iona Pipeline?
- Casino to Iona Pipeline is 46 km long.
- How much gas can Casino to Iona Pipeline carry?
- Casino to Iona Pipeline has a design capacity of 1.06 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Casino to Iona Pipeline operating?
- Casino to Iona Pipeline is operating, having started in 2006.
- Who owns Casino to Iona Pipeline?
- Casino to Iona Pipeline is owned by Mitsui & Co. and Santos Ltd, as recorded in the current tracker release.