Gas transmission pipeline · Carisbrook to Horsham
Carisbrook to Horsham Pipeline
Carisbrook to Horsham Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 183 km long and 0.1 bcm/y of capacity, starting up in 1998. It runs from Carisbrook to Horsham. It is owned by Gas Pipelines Victoria.
Length
183 km
Capacity
0.1 bcm/y
0.1 Mtpa LNG equivalent
Segments tracked
1
Route
Carisbrook to Horsham Pipeline runs from Carisbrook to Horsham. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Carisbrook
- To
- Horsham
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 178 km
- GEM pipeline ID
- P1138
- Start year
- 1998
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Carisbrook → Horsham | 183 | 0.1 | — | 1998 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Carisbrook to Horsham Pipeline run?
- Carisbrook to Horsham Pipeline runs from Carisbrook to Horsham, crossing Australia.
- How long is Carisbrook to Horsham Pipeline?
- Carisbrook to Horsham Pipeline is 183 km long.
- How much gas can Carisbrook to Horsham Pipeline carry?
- Carisbrook to Horsham Pipeline has a design capacity of 0.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Carisbrook to Horsham Pipeline operating?
- Carisbrook to Horsham Pipeline is operating, having started in 1998.
- Who owns Carisbrook to Horsham Pipeline?
- Carisbrook to Horsham Pipeline is owned by Gas Pipelines Victoria, as recorded in the current tracker release.